Construction of Photovoltaic power plant for “C&C Textiles” Ltd., Haskovo
Complete implementation of the design, construction and putting into operation of a photovoltaic system plant with installed capacity of 412.34 kWp, mounted on a roof, covering the own consumption of a textile factory.
Estimated annual power generation from the plant – 500 MWh.